Overview
Metro-Link Express for Gandhinagar and Ahmedabad (MEGA) is a Special Purpose Vehicle (SPV) entrusted with the responsibility of implementation of MEGA Metro Rail Project. MEGA was registered on 03 December 2007 under the Companies Act 1956
Total Length:39.259 km
- North-south Corridor – 18.522 km (16 Stations)
- East-West Corridor – 20.737 km (19 Stations)
Major Contracts & Contractors
| Contract Package | Contract awarded to |
| General Consultancy | Systra-RITES-Oriental-AECOM |
| 96 Coaches (Rolling Stock) | Hyundai Rotem |
| Signaling System | Nippon Signal Co. Ltd, Japan |
| Apparel Park Depot | URC Construction |
| Gyaspur Depot | Gannon Dunkerly – PSPO JV |
| Vastral Gam – Apparel Park (Viaduct – 6km) | J Kumar Infraprojects |
| Vastral Gam – Apparel Park (6 Stations) | DRA – CICO JV |
| East Ramp – Kalupur (Tunnels & 2 Stations – 2.45km) | Afcons Infrastructure |
| Kalupur – West Ramp (Tunnels & 2 Stations – 4.38km) | Tata Projects – CRCC JV |
| Thaltej Gam – West Ramp (Viaduct & 7 Stations – 8.21 km) | Tata Projects – CRCC JV |
| Gyspur – Shreyas (Viaduct & 4 Stations – 4.62km) | IL&FS Engineering |
| Shreyas – Ranip (Viaduct & 6 Stations -8.94km) | Simplex Infrastructure |
| Motera – Ranip (Viaduct – 4.85km) | Ranjit Buildcon |
| Motera – Ranip (5 Stations) | Pratibha – Ranjit JV |
| Shreyas to Ranip (Viaduct & 6 stations – 8.94 km) | Simplex Infrastructure |
| Kalupur to West Ramp (Tunnels & 2 stations – 4.38 km) | Larsen & Toubro |
| Thaltej Gam to West Ramp (Viaduct, Sabarmati Bridge & 7 stations – 8.21 km) | Tata – CCECC JV |
| Electrification | Siemens India – Siemens AG, Germany |