
NAGPUR (Metro Rail News): Nagpur Metro’s upcoming Eco Park station on the Orange Line extension has reached around 90% physical progress, with construction underway since October 2023. The station is expected to improve connectivity to key institutions, government offices and the software hub along the Khapri-MIDC ESR corridor.
Nagpur Metro Rail Corporation Limited (NMRCL) shared the construction update on X, outlining the station’s progress, infrastructure and passenger facilities. The station has a total built-up area of approximately 5,500 sq m, along with 389 sq m earmarked for property development.
Nagpur Metro: Connectivity to major institutions and workplaces
Eco Park station is part of Reach 1A, the Orange Line extension connecting the Khapri–MIDC ESR corridor. Its location is expected to serve several major destinations in the surrounding area, including:
- All India Institute of Medical Sciences (AIIMS)
- Indian Institute of Management (IIM), Nagpur
- National Cancer Institute (NCI)
- Government offices and educational institutions
- Delhi Public School (DPS) and D Y Patil institutions
- The nearby software and IT hub
The station is expected to provide an additional public transport option for students, employees and visitors travelling to these destinations.
Get the Daily Metro & Rail Brief
Join 125,000+ metro and rail professionals. Project updates, new tenders and contract awards from across India, in your inbox every day.
Passenger facilities and accessibility features
Nagpur Metro’s Eco Park station’s design includes facilities for general commuters as well as passengers with reduced mobility. The planned infrastructure includes:
- Two lifts, two escalators and four staircases.
- Tactile flooring and accessible washrooms.
- A dedicated childcare room.
- Drinking water facilities.
- Round-the-clock CCTV surveillance.
- Full power backup.
These provisions are intended to improve accessibility, passenger convenience and station security.
Solar power and rainwater harvesting
Nagpur Metro’s Eco Park station will also incorporate several features aimed at reducing its environmental footprint. These include roof-mounted solar panels, rainwater harvesting and bio-digesters. The station will follow green building standards and use natural daylight and cross-ventilation to reduce dependence on artificial lighting and ventilation.
Construction progress
According to Nagpur Metro’s update, construction began on October 6, 2023. The station has now achieved approximately 90% physical progress. However, the corporation has not announced a specific date for its opening.
Once commissioned, Eco Park station will strengthen Metro access to institutions, offices and employment centres along the Khapri-MIDC corridor. Its planned accessibility and sustainability features will also add to the infrastructure of Nagpur Metro’s Orange Line extension.
Also Read: Aurionpro Emerges L1 for ₹151.84 Cr Nagpur Metro Phase 2 AFC Contract
Read nextAurionpro Emerges L1 for ₹151.84 Cr Nagpur Metro Phase 2 AFC Contract10 Nov 2026Get alerts for big metro and rail stories Openings, trials, fares and approvals. Two or three a day at most; turn them off any time.





