Home Latest News AECOM India-Nippon Koei JV wins general consultancy contract of Thane Metro 

AECOM India-Nippon Koei JV wins general consultancy contract of Thane Metro 

AECOM India-Nippon Koei JV wins general consultancy contract of Thane Metro 
AECOM India-Nippon Koei JV wins general consultancy contract of Thane Metro / Image Source: Sunil Kumar Reddy Kasa

MAHARASHTRA (Metro Rail News): Maharashtra Metro Rail Corporation Limited (Maha Metro) has awarded the General Consultant contract for the Thane Integral Ring Metro Project to an AECOM-led consortium. The consortium includes AECOM India Private Limited and Nippon Koei India Private Limited. The estimated cost of the contract is Rs 179.86 cr (excluding GST).

Contract details

InformationDetails 
Tender NumberT1-019/Consul05/2025 
Awarded ToAECOM India Pvt. Ltd. in consortium with Nippon Koei India Pvt. Ltd.
Contract ValueRs 179.86 crore (excluding GST)  
Contract Period 1,827 days 

Bidder details

BidderBid ValueStatus
AECOM India Pvt. Ltd. in consortium with Nippon Koei India Pvt. Ltd.Rs 179.86 crore (L1)Awarded  
Ayesa Ingenieria y Arquitectura, S.A.U.Rs 148.1 Cr (L2) Rejected (Financial)
Hill International Private Limited Rs 209.7 Cr (L4) Rejected (Financial)
Systra Mva Consulting (India) Private Limited Rs 170.3 Cr (L3) Rejected (Financial)

Thane Metro Project

The weekly brief metro & rail professionals read.

One email a week. We never share your address. Unsubscribe anytime.

The Thane Integral Ring Metro is a 29 km urban transit project planned to improve public transport and reduce traffic issues in Thane. The estimated cost of this metro corridor is  around Rs 12,200 crore and it will have 22 stations, including 20 elevated stations and 2 underground stations. Once completed, it will make travel within the city faster, easier, and more convenient. The project is expected to be fully operational by 2029.

Also Read: Indian Railways commissions Kavach 4.0 on Tundla – Panki Dham rail section

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here