Bangalore (Metro Rail News): The operations on the much-awaited Nagasandra -Madavara extension of the Green Line of the Bangalore metro finally began on 7 November. However, the official inauguration will be held later.
As per the Release, the Hon’ble Deputy Chief Minister, Government of Karnataka, along with Hon’ble MP, Bengaluru South, Hon’ble MLAs & other dignitaries travelled in Metro Train from Yeshvanthpur to Madavara and inspected the Reach 3 Extension line of 3.14 km and three stations from Nagasandra to Madavara (BIEC).

Nagasandra- Madavara Extension Of Green Line
Bangalore Metro’s Green Line Nagasandra- Madavara extension spans 3.7 km, covering 3 stations and was constructed at a cost of Rs 298 crore.
Stations covered:
- Manjunath Nagar
- Chikkabidarakallu (formerly Jindal Nagar)
- Madavara (BIEC)
Additional Information:
As per the BMRCL press release, the passenger services will start on 7 November, with the first train departing from Madavara at 05.00 am, while the last train will be leaving at 11:00 pm.
The travel time on the Madavara – Nagasandra section will be 10 minutes. However, this will not interrupt train operations on the other section of Green Line.