Home Latest News Maharashtra Metro issues tender for elevated metro viaduct in Reach 2A of NMRP Phase-2

Maharashtra Metro issues tender for elevated metro viaduct in Reach 2A of NMRP Phase-2

Maharashtra Metro issues tender for elevated metro viaduct in Reach 2A of NMRP Phase-2
Nagpur Metro
Listen to this story
0:00

 Nagpur (Metro Rail News): Maharashtra Metro Rail Corporation Limited has issued tenders for the design and construction of an elevated metro viaduct for a length of 6.92 km between Ch. (-) 657.182 m to Ch. (-) 7576.78 m in Reach 2A of NMRP Phase-2. The approximate cost of the project is INR 425 Crores, and the contract period is 30 months. 

The bid submission and document download period will be from 23rd February 2023 to 28th March 2023. The scope of work includes the design and construction of viaduct between the last pier of phase 1 to Lekha Nagar Metro station, including the viaduct in the station portion. The total length of the viaduct is 6,919.598 meters. 

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here