Home Latest News Mumbai Metro line 7A starts second underground Work

Mumbai Metro line 7A starts second underground Work

0
1,756
Mumbai Metro line 7A starts second underground Work
Maharashtra Chief Minister Devendra Fadnavis during the placing of the first viaduct for the 16.5-km Metro Line 7 that will have 14 stations between Andheri (East) and Dahisar (East), in Mumbai on Wednesday. Express Photo by Kevin D'Souza. 03.05.2017. Mumbai.

MUMBAI (Metro Rail News): Metro line 7A Civil work that will connect Mumbai airport-Andheri East Metro station has started and will be finished by December 2021. This would be the 2nd underground Metro line the other being the Colaba-Bandra-Seepz Metro line 3. Another underground corridor is planned between Wadala-GPO.

An extension of Metro line 7A which connects Andheri East-Dahisar East will have 2 stations. In 2018, the MMRDA accepted the green signal from BJP-Sena govt for extending Metro line 7 till Mumbai airport and on Dahisar side till Mira to Bhyander.

Metro line 7A Work was assumed to begin in January 2019 but fund-sharing issues with airport authorities delayed the project, according to sources.

The MMRDA in charge of the Metro corridors in the city and Mumbai Metropolitan Region has awarded the civil contract for Metro line 7A to J. Kumar Infrastructure.

Metro line 7A is a 3.2 km long corridor 0.98 km elevated and 2.915 km underground. This would be 2 tunnels. The expected cost of the project is Rs 6,607 cr.

Guide

Mumbai Metro: the complete guide

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here