Trial Run Conducted On Mumbai Metro Line 3 (Aarey- BKC)

0
200
Mumbai Metro 3
Representational image only

Mumbai (Metro Rail News): The Mumbai Metro Rail Corporation (MMRC) has successfully carried out trial run on Line 3, Aqua line between the Bandra Kurla Complex (BKC) and Arrey station spanning 12 km covering 10 stations. MMRC also revealed the coach of Line 3. 

mumbai metro
Image Credit: Amar

Mumbai Metro’s Line 3 

aqua line
Image Credit: Amar

Mumbai metro line 3 also referred to as Aqua line, a 33.5 km stretch providing connectivity between Aarey colony and the Cuffe Parade via 27 stations. 

Initially , the operations are expected to begin from Aarey colony and the BKC Stations through 10 stations. 

Stations covered : 

  • Aarey Colony
  • SEEPZ 
  • MIDC
  • Marol Naka
  • CSIA Terminal 2 
  • Sahar Road
  • CSIA Terminal 1 
  • Santa Cruz Vidyanagri
  • Bandra Kurla Complex 

PM Modi is likely to inaugurate the Mumbai Metro Line 3 on 26 September and operations are expected to begin from the first week of October. 

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.