BANGALORE (Metro Rail News): Rail Infrastructure Development Company Karnataka Limited (K-RIDE) has floated tender for track work contract C4 of the Bangalore Suburban Rail Project’s (BSRP) Corridor 4. Corridor 4, also known as Kanaka Line, spans 46.285 km between Heelalige and Rajankunte.
Tender Details
Opening Date | 10 Apr 2025 |
Closing Date | 9 Aug 2025 |
Tender Id | 2025_KRIDE_232476_1 |
Tender No | K-RIDE/BSRP/C4/Track Laying/2025 |
EMD | ₹ 1,47,00,000 |
Contract Details
Contract Amount: INR 147.33 Cr ( Approx)
Contract Duration: 24 Months
Scope of Work
The scope of work under Package C4 of the BSRP includes the Design, Supply, Installation, Testing, and Commissioning of Ballastless tracks between Heelalige and Rajanukunte in Corridor 4 of the BSRP.
Brief Scope of Work: Design, Supply, Installation, Testing and Commissioning of Ballastless, Ballasted Track, Fastening System and Turnouts from Chainage (-) 635 to Chainage 46,985 m from Heelalige to Rajanukunte in Corridor 4 of BSRP.”
Other Track Related Contract of the Bangalore Suburban Rail Project
In April, K-RIDE announced Rahee Infratech Limited as the lowest Bidder for the track contract of Bangalore Suburban Railways’ Corridor 2, which connects Benniganahalli and Chikkabanavara.
About the Bangalore Suburban Rail Project
The Bangalore Suburban Railway Project is an under-construction commuter rail network spanning 149.348 km and consisting of 4 Corridors.

Corridor | Line | Route | Length |
Corridor 1 | Sampige Line | KSR Bengaluru – Yelahanka – Devanahalli | 41.478 km |
Corridor 2 | Mallige Line | Baiyyappanahalli Terminal – Chikkabanavara | 24.866 km |
Corridor 3 | Parijaata Line | Kengeri – Whitefield | 35.52 km |
Corridor 4 | Kanaka Line | Heelalige – Rajankunte | 46.285 km |