MMRC received its 1st batch of Rail Tracks from Japan
MUMBAI (Metro Rail News): The Mumbai Metro Rail Co (MMRC) got its 1st batch of rail tracks that were transported to the Mumbai Port...
Mumbai Metro line 7A starts second underground Work
MUMBAI (Metro Rail News): Metro line 7A Civil work that will connect Mumbai airport-Andheri East Metro station has started and will be finished by...
For the area around Metro-3 stations MMRC to consider students’ designs
MUMBAI (Metro Rail News): Architecture students from the Rachna Sansad Academy of Architecture and Pillai College of Architecture are hoping to transform the areas...
70% tunneling work for Colaba-Seepz Metro done
MUMBAI (Metro Rail News): The metro rail body, Mumbai Metro Rail Corporation, has achieved 70% of tunneling work that is required for the Colaba-Bandra-Seepz...
MMRCL says, save as many trees as possible
MUMBAI (Metro Rail News): On Thursday, A judicial committee set up by the Bombay High Court to look into felling of trees to make...
Mumbai Metro | MMRC to integrate Metro 3 with bullet train terminal at BKC
Mumbai: The Mumbai Metro Rail Corporation (MMRC) executing the underground Colaba-Bandra-Seepz Metro-3 corridor plans to interconnect (integrate) the underground Metro corridor with the proposed...




