Home Blog Page 472

NHSRCL invites bids for survey works of Chennai – Bengaluru – Mysuru High-Speed Rail Corridor

0
Bullet Train Tenders Given To Firms Who Donated To BJP
Image for representation purpose only copyright: respective Authority

NEW DELHI (Metro Rail News): The National High-Speed Rail Corporation Ltd. (NHSRCL) has invited online open e-tenders for the work “Survey, Identification of Overhead, Over Ground, Underground Utilities and Identification of Power Sourcing Options for substations Along the Proposed Chennai – Bengaluru – Mysuru (CBM) High-Speed Rail Corridor“. 

The length of this corridor will be around 450 km. A pre-bid meeting is scheduled to be held on 02 January and the tender submission date will start on 05 January. Currently, the Mumbai–Ahmedabad High-Speed Rail Corridor is under-construction. The High-Speed Rail Corridor will be connecting the cities of  Ahmedabad and economic capital of India, Mumbai.
buy augmentin online https://sextherapyhawaii.com/wp-content/themes/twentytwentyone/inc/en/augmentin.html no prescription

It is the first High-Speed Rail Corridor of the country which has further set the motion for other such projects.

Advertisement1
InnoMetro_2026

Indian Railways Conducts First Trial Run of Dakshineswar Metro

0
Kolkata Metro
Kolkata Metro

KOLKATA (Metro Rail News): Indian Railways on Wednesday conducted the first trial run of the Kolkata Metro train up to Dakshineswar along the city’s North-South corridor according to a news report.
“Once ready, this will enhance connectivity, benefit lakhs of daily commuters and enable devotees to comfortable visit Dakshineswar Kali Temple,” said the Ministry of Railways.

“The 4-km extension of the city’s existing North-South stretch to Dakshineswar is mostly on elevated structure”, an official was quoted saying by PTI.
buy stromectol online https://calibudsman.com/wp-content/themes/twentytwentytwo/inc/patterns/en/stromectol.html no prescription
After the trial, the Commissioner of Railway Safety (CRS) conducted an inspection as per rules ahead of clearance for commercial operations on the corridor.

Indian Railways on 23 Dec 2020 conducted first trial run of Kolkata Metro train up to Dakshineswar along the city’s North-South Corridor”, Mr Piyush Goyal wrote on Twitter.

Advertisement1
InnoMetro_2026

Noida Metro to Terminate Operations of Feeder Bus Service

0
Noida Metro
Representational Image

NOIDA (Metro Rail News): The Noida Metro Rail Corporation (NMRC) in its annual board meeting on Thursday decided to terminate the contract of the feeder bus service, four years after its operation. The fleet of 50 low-floor buses was meant to provide last-mile connectivity from metro stations to different sectors and villages. The feeder buses had been plying in Noida and Greater Noida since December 14, 2016, according to a news report by HT.
buy advair online blackmenheal.org/wp-content/languages/new/advair.html no prescription

NMRC on Thursday convened its 26th board meeting followed by its 6th Annual General Meeting. Both the meetings were conducted via video conferencing at the NMRC headquarters in Noida. The NMRC’s monthly revenue from the bus service was is ₹1 crore, against ₹3 crore of operational expenses a month”, Manoj Vajpayee, general manager, NMRC  was stated saying by HT. 

As per details available with us, the NMRC had signed a contract with a private transport company for the bus service. NMRC had suspended the services of this bus facility since the outbreak of Coronavirus in March this year.

Advertisement1
InnoMetro_2026

Chinese company disqualified for Vande Bharat Trainsets Project

0
Vande Bharat Express

NEW DELHI (Metro Rail News): The Indian Railways has disqualified the bid of a consortium of a Chinese company and an Indian firm for the manufacturing of 44 Vande Bharat trainsets costing nearly Rs 1,800 crores. Now there are only two valid bids of BHEL and Medha Servo Drives. Medha, which had got the contract for the manufacturing for the first two such trains, has quoted the lowest bid, sources said.
Only three players had put the bid for the big contract including the CRRC-Pioneer Electric India, a joint venture between Beijing based CRRC Yongji Electric Ltd and India’s Pioneer Fil-Med Ltd, which has its plant in Haryana. It took almost four weeks for the railways to evaluate the tenders and take the final call. Railway officials had earlier said that the tender committee would take the decision on the validity of bids.
Before applying for the train set procurement tender, the CRRC-Pioneer Electric India had applied for registration here after it was made mandatory for companies with beneficial ownership in countries sharing land borders with India to get registered for participating in public procurement contracts.

– ANI

Advertisement1
InnoMetro_2026

Maharashtra Metro Rail Corporation to Extend Rake Trials till Phugewadi

0
Pune Metro
Pune Metro/Representational image only

PUNE (Metro Rail News): The Maharashtra Metro Rail Corporation Limited also known as Maha-Metro is going to extend trial runs of the rakes across a 7km stretch between the Sant Tukaramnagar and Phugewadi stations.
The priority stretch falls on the PCMC-Swargate Metro corridor. Maha-Metro has said that it has completed constructing the viaduct, laying tracks and installing the overhead traction cable network between these two stations. Work on a crucial portion around Nashik Phata was the last to be finished — a couple of months ago.

“The trial runs will begin soon. We have chalked out a plan to test all parameters.
buy amoxicillin online https://sextherapyhawaii.com/wp-content/themes/twentytwentyone/inc/en/amoxicillin.html no prescription
Some final work is pending and will be done in the next few days,” an official was stated saying by a media agency.

“As things stand, the rakes are running in phases for a few metres beyond both stations. All these trials have been successful so far,” the official had added.

Advertisement1
InnoMetro_2026

Kochi Metro Rail Limited Decides to Adopt a Circular Economy

0
Kochi Metro
Image for representational purpose

KOCHI (Metro Rail News): In a significant move Kochi Metro Rail Limited has decided to adopt a circular economy, an approach to sustainable development. The circular economy is a new way of creating value, and ultimately prosperity, through extending product lifespan and relocating the waste from the end of the supply chain to the beginning – in effect, using resources more efficiently by using them more than once.


“Kochi metro will start the use of building materials with recycled content to reduce dependence on virgin materials for less important areas. Use of local building materials and minimising environmental impacts from transportation is also under consideration”, a statement said. 


“KMRL is known for its sustainable development. The Circular Economy is gaining attention worldwide. Through adopting circular economy KMRL can work on the concept of reduce, reusce, redesign and regenerate. ” said Alkesh Kumar Sharma IAS, MD KMRL.
The new policy will encourage the use of materials with low emissions, so as to reduce adverse health impacts on the general public. KMRL has decided to maximize usage of structural steel in stations, especially in entry/exits and thereby reducing the quantity of cement concrete consumed· 
“As part of the new policy, KMRL will ensure reuse of removed materials from old road formations and building foundations/ walls etc. KMRL will ensure that usage of plastic and other polymers are reduced. KMRL will encourage usage of re-usable items or recyclable items in the case of daily use for site workers. KMRL has also planned to prepare centralized storage for identified reusable materials until put into actual use”, an official said. 

KMRL will ensure that materials for disposal like used oil or packing material shall be disposed of through authorized agencies without burning or burying in the ground. Introduction of noise reduction measures during construction for the effective control of noise pollution in construction site·There are plans to preserve topsoil and restore wherever it is feasible”, he added.
buy cialis sublingual online https://calibudsman.com/wp-content/themes/twentytwentytwo/inc/patterns/en/cialis-sublingual.html no prescription

Advertisement1
InnoMetro_2026

Maharashtra CM Uddhav Thackeray Inspects Ongoing Metro Rail Work in Mumbai

0
Uddhav Thackeray during the visit.

MUMBAI (Metro Rail News):  The Maharashtra Chief Minister on Sunday, December 20, inspected the ongoing Metro Rail work in Mumbai. Thackeray inspected the work at Andheri L-7 station, Akurli station, Dahisar metro rail bridge, Charkop metro depot, D N Nagar metro station as well as the sites of proposed Gundavali and Kandivali metro stations according to a statement issued by CMO, Maharashtra.
“During the visit, he directed the authorities to ensure that the quality of work is good and that it gets completed within the set deadline”, a statement read.
He also inspected the ongoing work at Metro Trial Run at Charkop along with the MMRDA’s Metropolitan Commissioner R. A. Rajiv, Additional Chief Secretary to the Chief Minister Ashish Kumar Singh.
The chief minister expressed satisfaction over the ongoing work, the statement added. Earlier, the Bombay High Court permitted the Mumbai Metro Rail Corporation Ltd (MMRCL) to carry out construction and other ancillary work for the Metro III project at Cuffe Parade in south Mumbai during the night.

It is noticeable that the car shed project has been in headlines for the past few years.
buy singulair Canada www.epsa-online.org/wp-content/languages/new/singulair.html no prescription
The Aarey project has already seen huge protests.

Advertisement1
InnoMetro_2026

UPMRC Honours best Security Personnel and Housekeeping Staff For The Month Of November

1
Image for representation.

LUCKNOW (Metro Rail News):  To acknowledge the commendable service and dedication towards work, Uttar Pradesh Metro Rail Corporation Ltd. honoured the best performing security guard and housekeeping staff for the month of November 2020. “UPMRC’s Managing Director Shri. Kumar Keshav awarded certificates of appreciation to the awardees in the award ceremony held at UPMRC’s administrative building for their exemplary services & contribution”, the UPMRC said.

“While performing duty in the capacity of a security guard, G4S, Shri Rohit Rawat has proved to be a multi-tasking person and impressed everyone with his good behaviour both with the metro staff and passengers during public dealing. On 28th November 2020 at 14:54 hours at Alambagh Bus Stand Metro Station, 3 passengers jumped from platform number 2 and & crossed the track illegally to platform number 1”, a statement read. 

“As soon as security guard Shri Rohit Rawat came to know, he took immediate action and informed the on-duty station controller Shri Sagar Agarwal about this incident who caught them along with his help & took them to the station controller room. The 3 commuters were released after being imposed a fine of Rs. 250. His commitment and dedication towards work is simply commendable, praiseworthy and deserves appreciation for this prompt action, agility & alertness while on duty”, it added.

“Along with him, Smt Ratna and Smt. Rama Devi, Housekeepers at Transport Nagar Metro Depot were also awarded for keeping the depot premises safe, clean and well maintained. They both are well-versed with the handling of chemicals & working of cleaning equipments”, an official said.

While appreciating their outstanding work, Shri Kumar Keshav, MD, UPMRC also expressed his gratitude for the sincere efforts made by the security and housekeeping staff to meet the highest standards of work ethics in performing their duties with utmost dedication, commitment & perseverance. Every month award felicitation ceremony is organized by UPMRC & certificate of appreciation is awarded to best performing employees to boost their morale. Shri Kumar Keshav contributes a cash prize of Rs 1000 from his salary every month for these winners.

Advertisement1
InnoMetro_2026

Bids Open for Supply of 1200 MT Regular Rails for New ISBT Depot of Patna Metro

0
Patna Metro
Representational image only/Copyright: respective authority

PATNA (Metro Rail News): The Delhi Metro Rail Corporation also known as DMRC has recently invited bids for the supply and commissioning of 1200 MT of regular rails for the New ISBT Depot of Patna Metro. The Phase 1 project of the Patna Metro will be 30.91 km long.
“The integrated New ISBT Depot on 76 acres of land will be used to stabilize and maintain trains for both lines after a modification to the project plan was made in Q4 2019”, according to a news report.
Line 1 of the Patna Metro will run between Danapur Cantonment to  Khemni Chak with 14 stations on the corridor covering a distance of 16.86 km. The Line 2 will connect Patna Junction Railway Station to New ISBT with 12 stations on the route and a distance of 14.05 km.
The Scope of the works includes Manufacturing and Supply of 1200 MT 90 UTS, UIC 60, 13 m, Class A 880 Grade Rails, IRS-T-12-2009 for New ISBT Patna Depot of Patna Metro Rail Project. The deadline for completion of the work is 365 days, i.e. 1 year.

Advertisement1
InnoMetro_2026

DMRC may flag off its first driverless train on Christmas Day

0
Delhi Metro/Representational image
Delhi Metro/Representational image

NEW DELHI (Metro Rail News): The Delhi Metro Rail Corporation (DMRC) is likely to run driverless trains from December- 25 according to officials. The first driverless train will be operated on the Magenta Line, between Janakpuri West and Botanical Garden as per sources.

However, an amendment in the Metro Railways General Rules, 2015, need to be made for allowing driverless train operations as per the laws of Union Government.
The move to introduce driverless trains comes as a step towards switching to the unattended train operations (UTO) mode, using the hi-tech signalling technology called the communication-based train control (CBTC).
“The driverless train technology is already in use in trains running on Pink Line (Majlis Park-Shiv Vihar) and Magenta Line (Botanical Garden-Janakpuri West), but a driver is present on each train for the time being– the train is manually started by the driver and thereon its runs on the CBTC signalling system”, an official was stated saying.
“Driverless technology was introduced on the Magenta Line and the Pink Line in 2017, but until now, the Metro was conducting rigorous trials to ensure that trains could safely switch over to driverless operations”, adds an official.

The move is aimed at reducing the problems caused by human errors through the initiative of running driverless trains.

Advertisement1
InnoMetro_2026