NOIDA (Metro Rail News): The Noida Metro Rail Corporation (NMRC) has submitted the DPR for Noida Metro’s Extension from Sector 142 to the Botanical Garden to the U.P Government.
Approval of DPR
NMRC board has already approved the proposed DPR with eight stations spanning a length of 11.56 kilometres in its meeting held on December 27, 2023. The corridor will be built at an estimated cost of Rs 2,254.35 Crores.
Seamless Connectivity
It will provide seamless connectivity to many commuters from NOIDA, enabling them to access Blue and magenta lines. Additionally, the Botanical Garden is a strategic station enabling connectivity with the entire Delhi.
Multi-Model Integration
The station will ensure multi-modal integration with the Botanical Garden Bus Stand, IGI Airport via Magenta Line and the Indian Railways via Blue Line. This arrangement would increase this line’s attraction and ensure efficient transportation across the NCR.
Stations
The proposed route in the DPR would have metro stations as Botanical Garden (already existing), Noida Sector 44, Noida Office, Sector 97, Sector 105, Sector 108, Sector 93, Panchsheel Balak Inter College and Sector 142 (already existing).
Intrigued by the future of Metro and its impact on our city? Join us at our upcoming InnoMetro event to delve deeper into this vital issue. Stay informed, get involved, and let’s ride the Metro towards a brighter, more sustainable future together.