Mumbai Metro | Mumbai’s Colaba-Bandra-SEEPZ Metro-3 to be ready by 2021
Mumbai: The Mumbai Metro Rail Corporation (MMRC) is likely complete the Metro-3 corridor (Colaba-Bandra-SEEPZ) by December 2021 instead of early 2021. It has also...
Mumbai Metro | MMRC appoints architects for Kalbadevi-Girgaum rehabilitation
Mumbai: The Mumbai Metro Rail Corporation (MMRC) has appointed GD Sambhare & RH Mahimatura Architects to provide Architectural, Design and PMC services for Kalbadevi-Girgaum in-situ rehabilitation...
Mumbai Metro-3 | Project affected residents plan to approach Bombay High Court
Mumbai: Affected by the construction of the Colaba-Bandra-Seepz Metro-3 underground corridor, residents of South Mumbai have said that they plan to approach the Bombay...
Mumbai Metro | DN Nagar-Mandale Metro-2B corridor work hits a roadblock
Mumbai: Seven months after floating bids for construction of DN Nagar-Mandale Metro-2B corridor, the Mumbai Metropolitan Region Development Authority (MMRDA) has hit a roadblock...
Mumbai Metro | Mumbai-Thane metro line gets approval from State
Mumbai: Maharashtra Chief Minister Devendra Fadnavis on Friday approved a 32-km metro line connecting Mumbai with adjoining Thane. The 32-km Wadala-Ghatkopar-Thane-Kawarvadavali metro line is...
Mumbai Metro | MMRC considers change in design to cut civil cost of Metro III project
Mumabi: In order to cut the construction cost of the 32.5-km long underground Metro line between Colaba and Seepz, the Mumbai Metro Rail Corporation...




