L&T’s Tunnel Boring Machine ‘Lavi’ Achieves Final Breakthrough at RMS Station
Ranjit Buildcon has begun construction on Package C3 of Ahmedabad Metro Phase 2, which will extend the Red Line by 22.838 km through 20 new stations. The package includes the construction of seven elevated stations and a 7.553 km elevated corridor connecting Sector-1 to Mahatma Mandir in Gandhinagar. Dilip Buildcon was awarded the contract for this package in October 2022, valued at Rs. 723.45 crores, and later subcontracted the construction work to Ranjit Buildcon.
Dilip Buildcon wins a contract for Surat Metro Rail Project Phase 1 in Gujarat
GUJARAT (Metro Rail News): Dilip Buildcon will carry out a contract deal with Gujarat Metro Rail Corporation (GMRC) Ltd for the Surat Metro Rail...
Dilip Buildcon debuts package 1 last segment of Bhopal Metro
MADHYA PRADESH (Metro Rail News): On November 2, Dilip Buildcon Ltd. (DBL) debuted the last of 1851 precast segments for the 6.225 km Package...




