First eight-car prototype metro train of MMRC is ready for technical trials
MUMBAI (Metro Rail News): The first eight-car prototype metro train was successfully put together using the battery-operated rail-cum-road shunter for the technical trials...
First 2 cars of prototype train for Mumbai Metro Line-3 to reach Mumbai soon
MUMBAI (Metro Rail News): The first two cars of a prototype train which will be used for trial runs of Mumbai Metro line-3 are...
MMRC completes work On Mumbai Metro Line 3
MUMBAI (Metro Rail News): The Mumbai Metro Line (MML) which is a stretch from Colaba to SEEPZ has been completed on June 28 after...
Mumbai Metro Rail-3 underground project could take two more years to complete
MUMBAI (Metro Rail News): In a press conference on Thursday, MMRDA's metropolitan commissioner SVR Srinivas said, "Mumbai metro line 3 will take at least...
Mumbai Monorail corridor to be linked with Colaba-Seepz Metro-3 line at Mahalaxmi
MUMBAI (Metro Rail News): The Mumbai Metropolitan Region Development Authority (MMRDA) has decided that the Monorail corridor will be linked with Colaba-Seepz underground Metro...
Mumbai Metro Line-3 cost escalated by Rs. 10,000 Cr in 5 years
MUMBAI (Metro Rail News): The cost of Colaba-Bandra-Seepz Line (Line-3) of Mumbai Metro has escalated by over INR 10,000 Crores to INR 33,406 Crores...




