Titagarh Reveals Train Design For Ahmedabad Metro Phase 2
Ahmedabad (Metro Rail News): Following the inauguration, Ahmedabad Metro Phase 2 reached another milestone as the Titagarh Rail System has finally revealed the design...
GMRC Introduces Special Paper Tickets at ₹50 for IPL Matches in Ahmedabad
AHMEDABAD (Metro Rail News): In view of the upcoming scheduled IPL-2024 cricket matches on 24th & 31st March 2024 and 04th April 2024 at...
First Metro Train Trials Conducted Between GNLU and GIFT CITY Stretch of the Ahmedabad Metro
AHMEDABAD (Metro Rail News): On Sunday, March 10, the first metro train trials were conducted between GNLU and the GIFT CITY link. GNLU-GIFT City Stretch It...
GMRC Awards 350 Cr. Contract to Titagarh Rail Systems for Ahmedabad Metro Phase II Project
AHMEDABAD (Metro Rail News): Titagarh Rail Systems Ltd (TRL) has secured a Rs 350 crore contract from the Gujarat Metro Rail Corporation (GMRC). TRL...
The Ahmedabad Metro Phase 2
The Ahmedabad Metro Phase 2 project, which comprises two corridors covering a total distance of 28.254 km, was approved by the Indian Central Government's...
L&T’s Tunnel Boring Machine ‘Lavi’ Achieves Final Breakthrough at RMS Station
Ranjit Buildcon has begun construction on Package C3 of Ahmedabad Metro Phase 2, which will extend the Red Line by 22.838 km through 20 new stations. The package includes the construction of seven elevated stations and a 7.553 km elevated corridor connecting Sector-1 to Mahatma Mandir in Gandhinagar. Dilip Buildcon was awarded the contract for this package in October 2022, valued at Rs. 723.45 crores, and later subcontracted the construction work to Ranjit Buildcon.




