BEML Rolls out Prototype of New Driverless Metro Trainset for BMRCL’s Phase-2 Network

0
252
BEML Rolls out Prototype of New Driverless Metro Trainset for BMRCL’s Phase-2 Network

BEML Limited rolled out the prototype of its state-of-the-art Driverless Metro Trainset (5RS-DM), developed for the upcoming corridors of BMRCL Phase 2, 2A and 2B. The prototype for the pink line was formally rolled out by Dr. J. Ravishankar, IAS, MD, BMRCL, in the presence of Shri Shantanu Roy, CMD, BEML Ltd, along with senior leadership from both organisations. The dignitaries also witnessed the test run of the train at the BEML Rail Complex, marking a major milestone in the project’s progress.

2beb3462 55d8 4911 b14d 315c5964cbbb
e4f780b5 2d04 4d8f 9045 38392e7c8833

Under this prestigious contract, BEML will supply 318 Standard Gauge metro cars, designed, engineered and manufactured at its Bengaluru facility for Blue line (Airport line) and Pink line. The trainsets will undergo a detailed programme of testing and commissioning in line with BMRCL’s implementation timeline , followed by comprehensive maintenance support for up to 15 years. This rollout marks a significant step toward the execution of the ₹3,177-crore contract, awarded to BEML through a highly competitive bidding process.

The newly rolled out prototype reflects BEML’s expanding contribution to India’s metro ecosystem, especially in the domain of driverless (GoA4) urban transit systems. All design and engineering activities have been executed by BEML’s in-house teams, demonstrating the organisation’s capability to deliver world-class, self-reliant mobility solutions for major urban transport projects.

73a3bc52 d66c 455b a7a1 b45b6ea9b63a
2b22cb1b 39db 4484 906f 10dcc534ac10

Speaking on the occasion, Shri Shantanu Roy, CMD, BEML Ltd, said: ““The unveiling of this driverless metro prototype marks yet another significant milestone in BEML’s journey toward delivering next-generation mobility solutions for India’s growing cities. Bengaluru is expanding rapidly, and reliable, efficient, and modern transit systems are essential to sustaining this growth. We sincerely thank BMRCL’s management for their continued support and for placing their trust in BEML’s metro capabilities as we work toward a truly futuristic metro ecosystem.”

Sharing his thoughts on the occasion, Dr. J. Ravishankar, IAS, MD, BMRCL, said, “With the roll out of this first proto type marks a commitment by BEML to supply, the state-of-the-art trainsets which will enhance commuting experience. This is a milestone towards fulfilling the aspirations of metro commuters traveling on the upcoming R6 line and the ORR Airport line. I congratulate all the teams involved in this achievement and look forward to continued cooperation as we progress towards successful commissioning of the metro corridors which support reduction in traffic congestion, lowering carbon emissions, contributing to the city’s economic growth and quality of life.”

0f7ab1b0 b736 4fa0 bb74 b82a825ae52c

Key Features of the New Driverless Trainset:

• Modern, contemporary interiors for enhanced passenger comfort 

• Energy-efficient systems with upgraded passenger information features

• Extra Wide gangways for seamless passenger movement between coaches

• USB charging ports, ergonomic seating, and improved accessibility provisions

• Compliance with advanced fire safety, crashworthiness, and international safety standards

• Compatibility with CBTC (Communication-Based Train Control) for fully driverless operations

The roll out of the prototype marks the beginning of the delivery milestones for the project, with serial production set to proceed in alignment with agreed timelines. With this rollout, BEML continues its steadfast support to Bengaluru’s rapidly expanding metro network, contributing to a smoother, safer, and more efficient commute for the city’s growing population. The prototype underscores BEML’s commitment to advancing transformative, self-reliant urban mobility solutions under the spirit of Aatma Nirbhar Bharat.

8f1160b9 8d3b 4ed6 87c1 a8774a774cc9 2

Recently, BEML has secured additional  order worth ₹414 crore from Bangalore Metro Rail Corporation Limited (BMRCL).  Under this top-up order, BEML will supply six additional driverless metro trainsets (36 cars) for the Bangalore Metro Rail Project, Phase 2 (Reach 5, yellow line). Earlier, during March 2025, BEML also secured  the  additional order worth 405 crores for 42 additional cars for Reach 6 of Bangalore metro. With this, total supply has increased from 53 trainsets (318 cars) to 66 trainsets (396 cars). It is to be noted that BEML is the largest rolling stock supplier to Bangalore metro and in the past has  supplied to the Green line and Purple line.


Join the 6th edition of InnoMetro to explore how the progressions in AI are improving the railway systems, including ticketing, rolling stock, and signalling. Witness the innovation from 200+ exhibitors at India’s leading show for metro & railways which is going to held on 21-22 May 2026 at Bharat Mandapam, New Delhi

Register now: https://innometro.com/visitor-registration/

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.