Nagpur Metro invites another tender for the construction of Elevated Viaduct and 5 metro stations for Reach-1A

0
912

NAGPUR, (Metro Rail News): Maharashtra Metro Rail Corporation Limited (Maha Metro) invites another tender for the construction of an Elevated Viaduct of length 9.55 Km and five Metro Stations (four elevated and one at grade) for the 18.5 km long Reach-1A from MIHAN to MIDC ESR under Phase-2 of Nagpur Metro Rail Project.

The work also includes the construction of an embankment at a grade section of length 1.017 km in two different parts along with fabrication and launching of the superstructure of railway span of length 70 meters.

Name of Work

Design and Construction of Elevated Metro Viaduct of length 9.550 km between Ch. 19970 m to Ch. 20700 m & Ch. 21296.917 m to Ch. 30117.298 m in Reach 1A, Construction of Embankment for At-Grade section of length 1.017 km (Ch. 19550 m to Ch. 19970 m & Ch. 20700 m to Ch. 21296.917 m), Fabrication And Launching of the superstructure of Railway span of length 70 m and Construction of Five metro stations (Four Elevated And One at-grade) in Reach-1A of NMRP Phase-2.

Important Details 

Tender Number: N2 C-01/2021

Approximate Cost of Work: INR 470.30 Crores

Completion Period of the Work: 30 Months

Sale of Bidding Documents: From 30.07.2021 at 16:00 Hrs to 31.08.2021 up to 16:00 Hrs

Pre Bid Meeting: 10.08.2021 at 11:00 Hrs

Date of Submission of Tender: Online submission till 31.08.2021 up to 16:00 Hrs

Technical Bid Opening Date: 31.08.2021 after 16:30 Hrs

Sale of the document, e-payment procedure, submission, and other details are available on Maha-Metro tender portal under section in e-tenders portal – https://mahametrorail.etenders.in.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.