MMRDA looks for contractor to complete Metro 2B’s pending works

0
1061
Three companies in contention for bid for balance civil work in Mumbai Metro line 2B
Photo Copyrighted: MMRDA

Mumbai (Metro Rail News): The Mumbai Metropolitan Region Development Authority (MMRDA) is now looking for a contractor to carry out the balance job of Metro Line 2B (DN Nagar to Mandale). The work includes the construction of elevated viaduct and 10 elevated stations –ESIC Nagar, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar, Saraswat Nagar, National College, Bandra, Income Tax office and ILFS. The scope of work excludes architectural finishing and pre-engineered steel roof structure of the stations.

The estimated cost of the work is Rs 1167.75 crore, without GST. The authority has arranged a pre-bid meeting with the interested contractors on September 10 at 11am. The final date of bid submission is October 10 up to 6pm.

The corridor will have interchange available at DN Nagar on Metro Line One, at Bandra (Suburban), ITO junction (Metro Line 3), Kurla East (Suburban & Metro Line 4), Chembur (Monorail) and Mankhurd (Suburban, CST-Panvel fast corridor, Mumbai–Navi Mumbai Airport fast corridor according to MMRDA officials.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.