Page 31 - Demo
P. 31


                                    www.metrorailnews.in METRO RAIL NEWS -MAY - 2025 31Line Status As of 31 January 2025Line 10 ( Green Line ) %u2022 Line 10 of the Mumbai Metro is currently under implementation. The Line 10 spans 9.209 km between Gaimukh and Shivaji Chowk (Mira Road) through 4 stations. %u2022 The Detailed Project Report (DPR) of Mumbai Metro Line 10 was prepared by Delhi Metro Rail Corporation (DMRC) in March 2019. %u2022 The Prime Minister, Shri Narendra Modi, laid the foundation stone for the Mumbai Metro Line 10 Project on 7 September 2019. Features of Line 10Line 11 ( Green Line ) %u2022 Line 11 of the Mumbai Metro is currently under implementation. The Line 11 spans 12.7 km between Wadala %u2013 Chhatrapati Shivaji Maharaj Terminus. %u2022 The Detailed Project Report (DPR) of Mumbai Metro Line 11 was prepared by Delhi Metro Rail Corporation (DMRC) in September 2018. %u2022 The Prime Minister, Shri Narendra Modi, laid the foundation stone for the Mumbai Metro Line 11 Project on 7 September 2019.  Elevated ViaductSr. No.Name of WorkStatus in %1Pier Cap Erection98% Completed2U-Girder Erection93% Completed3Portal Beam Erection97% Completed4I-Girder Erection100% Completed5Deck Slab Casting93% Completed6Deck Slab Casting93% Completed8Parapet Erection85% Completed Elevated Station1Concourse Pier Arm Erection96% Completed2Platform Pier Arm Casting100% Completed3Platform Pier Arm Erection95% Completed4Portal Beam Erection (Dahisar Station)100% Completed5U-Girder Erection96% Completed6PI-Girder Erection90% Completed7L-Girder Erection97% Completed8T-Girder Erection93% CompletedFlyover1Hammer Head100% Completed2Abutment Pile100% Completed3Abutment Pile Cap100% Completed4Abutment Pier Cap83% Completed5Dirt Wall83% Completed6Flyover Pier Cap Casting90% Completed7Flyover Pier Cap Erection88% Completed8I-Girder Casting92% Completed9I-Girder Erection86% Completed10Deck Slab Casting73%CompletedRoute length9.209 km Number of Total Stations4Estimated CostRs. 4,476 crElevated / UndergroundFully ElevatedEstimated Ridership 2031: 4.66 lakh/dayFEATURED METRO SYSTEM
                                
   25   26   27   28   29   30   31   32   33   34   35