Page 26 - Demo
P. 26


                                    The total length of Metro Corridors will be 337 km, and the aim is to complete most of these corridors by 2024-26.Mumbai Metro: Driving the City's Transport EvolutionOverviewThe Mumbai Metro is an urban Mass Rapid Transit System (MRTS) being built to serve Mumbai, Maharashtra%u2019s capital and largest city. In June 2006, Prime Minister Manmohan Singh laid the foundation for the Mumbai Metro Rail Project. Navigating through the Network of the Mumbai Metro systemThe Mumbai Metro spans 337 kms and consists of 10 Lines. Currently, 59.19 km of the total route is operational, while 143.65 km of the route is under construction. Here's a Breakdown of the Mumbai Metro NetworkLine 1 ( Blue Line ) Line 1 of the Mumbai Metro is an operational elevated corridor which spans 11.40 km, connecting VersovaAndheri-Ghatkopar through 12 stations. The Line 1 of Mumbai Metro has been built at a cost of Rs. 2,356 Cr through a PPP Model ( Public Private Partnership) Features of Line 1Line 2A ( Yellow Line ) The Line 2A of Mumbai Metro is an operational 18.6 km long elevated corridor which connects Dahisar to D N Nagar. This Line features 17 stations in total. The Project was implemented in 2 Phases. Phase 1: The Phase 1 of Mumbai Metro Line 2A spanned 9.8 km and covered 9 stations between Dahisar and Dahanukarwadi. Phase 2: Phase 2 of Mumbai Metro Line 2A spanned 8.8 km and covered 8 stations between Dahanukarwadi and D N Nagar. Phase 1 became operational on 2nd April, 2022, while Phase 2 of Mumbai Metro Line 2A became operational from 19th January, 2023.The Line 2A of Mumbai Metro was completed at a cost of Rs. 6,410 Cr (including state taxes and 7.5% p.a escalation & IDC). Features of Line 2A Line 2B ( Yellow Line ) Mumbai Metro Line 2B is under construction elevated metro corridor which spans 23.643 km from D N Nagar to Mandale through 20 stations. The Line 2B of the Mumbai Metro will be completed for Rs. 10,986 Cr.Route length11.40 km (Elevated)Number of Total Stations12SpeedMax Speed: 80 kmphAverage Speed: 35 kmphEstimate Ridership2031- 8.83 lakhs per dayProject Implementing AgencyMumbai Metro One Private LimitedTotal project completion costRs. 2,356 CrVGFRs. 650 CrImplementation Period2007-2012 (As per Concession Agreement)Interchange FacilitiesMetro Line 2: D. N. NagarWestern Railway: AndheriMetro Line 3 : Marol NakaCentral Railway: GhatkoparRoute length18.6 kmNumber of Total Stations17Estimate Ridership2031- 6.09 Lakhs (PHPD 15565)Total project completion costRs. 6,410 CrInterchangeFacilitiesD. N. Nagar (Line 1 : Ghatkopar - Versova)Shastri Nagar (Line 6: Swami Samarth Nagar- Vikhroli)Dahisar (Line 7 : (Andheri (E) - Dahisar (E) corridor)FEATURED METRO SYSTEM
                                
   20   21   22   23   24   25   26   27   28   29   30