Page 27 - Demo
P. 27


                                    Features of Line 2BLine Status as of 23 February 2025Recent Development on Mumbai Metro Line 2BIn April 2025, the Mumbai Metropolitan Region Development Authority (MMRDA) initiated the trial runs on the MandaleMankhurd stretch of Mumbai Metro Line 2B. This section features 5 stations. Line 3 ( Aqua Line ) %u2022 The Line 3 of Mumbai Metro is a partly operational metro corridor which spans 33.5 km connecting Cuffe Parade %u2013 BKC %u2013 Aarey JVLR through 27 stations. %u2022 Currently, Phase 1 of Line 3, spanning 12.69 km between Bandra Kurla Complex ( BKC) and Aarey JVLR, is operational. Prime Minister Narendra Modi inaugurated this section on 5 October 2024. Features of Line 3Line 4 ( Green Line )%u2022 The Line 4 of Mumbai Metro is an under-construction elevated line which spans 32.32 km between Wadala and Kasarvadavali, featuring 30 stations. Mumbai Line 4 Project will be executed at Rs. 14,549 Cr. Line Status As of 10 February 2025 became operational and opened for passengers on 8th June 2014. Line 4A ( Green Line ) %u2022 Line 4A of the Mumbai Metro is the under-construction extension of Line 4. Line 4A spans 2.7 km from Kasarvadavali to Gaimukh through 2 stations. The Project will be completed at a cost of %u20b9 949 Cr.Route length23.643 kmNumber of Total Stations20Estimate Ridership2031- 10.5 Lakhs (PHPD 38509)Total project completion costRs. 10,986 Cr.DepotMandaleInterchange FacilitiesD. N. Nagar (Line 1)Bandra (Suburban)ITO junction (Line 3)Kurla East (Suburban & Line 4)Chembur (Monorail)Mankhurd Suburban, CST-Panvel fast corridorMumbai-Navi Mumbai Airport fast corridorSr. NoName of WorkStatusPile Cap97.00% CompletedPier Work91.00% CompletedPier Cap / Portal BeamErection %u2013 84.00% CompletedU / I Girder WorksErection %u2013 75.00% CompletedMandale Depot Works97.21% CompletedRoute length33.5 km Number of Total Stations27Speed Max Speed: 90 kmphAverage Speed: 34 kmphEstimated CostRs. 23,136 croreRolling Stock248 coaches (31 x 8) by AlstomFeatures of Line 4 Route length32. 32 km Number of Total Stations30Total project completion costRs. 14,549 Cr. (Incl. Taxes and Duties)Estimated Ridership 2031: 12.13 Lakhs (PHPDT- 33417)Elevated / UndergroundFully ElevatedSr. No.ActivityStatus 1Pier (Viaduct+Station up to PL)94% Completed 2 Piercap Erection93% Completed 3U Girder Erection 88% Completed 4I Girder Erection 65% Completed 5Deck Slab 59% Completed 6L Gird Erection 61% Completed 7T Gird Erection68% Completed 8RCC Beam Erection38% Completed 9Portal Beam Erection16% Completed 10PI Girder Erection0% Completed FEATURED METRO SYSTEM
                                
   21   22   23   24   25   26   27   28   29   30   31