Lucknow Metro | LMRC installs MSS to reduce vibrations during metro tunneling work

0
929
MD Keshav Kumar inspecting metro tunneling work
Lucknow Metro Site Visits by MD Kumar Keshav with team

Lucknow: The Lucknow Metro Rail Corporation (LMRC) is installing Mass Spring System (MSS) to reduce the vibrations generated during train movement inside tunnel between the 3.67 km long underground corridor between Charbagh and KD Singh Stadium Metro Station. Shri Kumar Keshav Managing Director, LMRC today inspected this system while reviewing the work progress of this underground metro section which would be made operational for public from April, 2019. Here are some photographs-

Managing Director reviewed the construction work of Hazaratganj, Sachivalaya and Hussainganj Metro Station where he reviewed the construction work for Auxiliary Building which will provide cooling facilities to these metro stations. He also reviewed the concourse area where the construction of stairs and track bed is completed. This Track Bed is now connected to the tunnel of each Metro Stations.

Lucknow Metro on one side has finished the installation of Over Head Electrification (OHE) work from Hazaratganj Metro Station to Hussainganj whereas the track work from Hazaratganj to Sachivalya Metro station is completed. These Underground Metro Station will have eight Emergency Gates which can be used by the time of emergency.

Lucknow Metro also finished the construction work of Cut and Cover (Ramp section) from Charbagh to Hussainganj Underground Metro station and from Hazaratganj Underground Metro station to KD Singh Stadium Metro Station.
buy soft pack online https://herbalshifa.co.uk/wp-content/themes/twentytwentytwo/inc/patterns/en/soft-pack.html no prescription

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.