AHMEDABAD (Metro Rail News): Kankariya East Metro station in the east-west corridor of the Ahmedabad Metro Rail Project is ready for passenger operation today, on 4th March 2024.
Metro Operations
Metro train services will be available at Kankariya East station for passengers as per existing operational timings, effective 5 March 2024.
Current Operations
Metro Train services are operational in Ahmedabad from 6:20 AM to 10:00 PM with a flat 12-minute headway between 07:00 AM and 10:00 PM.
Ahmedabad Metro
A detailed overview of Ahmedabad Metro has been provided below:
Line | Phase-1 | Phase-2 | Total Length | |
Blue Line | 21.16 km | — | 21.16 km | |
Red Line | Main Line | 18.87 km | 22.84 km | 41.71 km |
Branch Line | — | 5.42 km | 5.42 km | |
Total Length | 40.03 km | 28.26 km | 68.29 km |
Current Status
Line | First Operational | Last Extension | Number of operational stations | Operational length |
Blue Line | 4 March 2019 | 30 September 2022 | 16 (except Thaltej Gam and Kankaria East) | 19.76 km |
Red Line | 30 September 2022 | N/A | 14 (except Sabarmati Railway station) | 18.87 km |
Total | 29 (with Old High Court interchange) | 38.63 km |
Discover the endless possibilities of our city’s Metro at InnoMetro, our flagship Expo and Conference. Be an active participant in shaping its future towards a more sustainable tomorrow. Stay informed and join us to take a step towards a brighter future.