Connectivity between IGI Terminal 1 and Metro Station Now Available to Passengers

Each entry/exit of the subway has two escalators and two lifts each along with a staircase.

0
1126
Connectivity between IGI Terminal 1 and Metro Station Now Available to Passengers
Connectivity between IGI Terminal 1 and Metro Station Now Available to Passengers

NEW DELHI (Metro Rail News): A 130 meter long underground pedestrian subway providing connectivity between the Terminal 1 – IGI Domestic Airport Metro Station of Magenta Line and the Arrival Terminal of the Domestic Airport Terminal 1 of the Indira Gandhi International Airport, was opened for public on 4th December in the presence of Sh. Vikas Kumar, Managing Director, Delhi Metro Rail Corporation (DMRC).

Advertisement1
InnoMetro_2026

1234.original

ADDITIONAL INFORMATION

Each entry/exit of the subway has two escalators and two lifts each along with a staircase. The lifts which have been installed in the subway for passenger movement are more spacious than the general lifts installed in the Metro system and have a capacity of carrying about 26 people. The subway has also been decorated with attractive artwork in line with DMRC’s efforts to depict the rich heritage of the region.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.