Indore Metro: RVNL – URCC JV Begins Casting Segments for Package IN-04

0
259
Indore Metro

Indore Metro (Metro Rail News): Indore Metro phase 1 advanced as Rail Vikas Nigam Ltd. – URC Construction (RVNL – URCC) JV started casting the box segment for Package IN-04 spanning 5.2 km from Shaheed Bagh to Palasia Chauraha through 5 stations. 

Gg pkUnWYAAgzDt
Image Credit: MPMRCL

Each segment cast by RVNL – URCC JV will be 8.5m wide and 2.1m tall. These segments will be utilised to build the viaduct which will connect the elevated stations under this package.

Gg pkO7XQAAA9MH
Image Credit: MPMRCL

Package IN-04 of Indore Metro 

RVNL – URCC grabbed Package IN-04 of Indore Metro from Madhya Pradesh Metro Rail Corporation Ltd. (MPMRCL) at Rs. 543 crore in March 2024. 

Scope of Work 

The scope of work under this package includes the construction of 5 elevated stations on the Yellow line spanning 31.55 km connecting Palasia – Railway Station – Rajwara- Airport – Bhawarsala via 30 elevated & underground stations.

Stations 

  • Shaheed Bagh
  •  Khajrana Chauraha
  • Bengali Chauraha
  •  Patrakar Colony
  • Palasia Chauraha

This package is the 4th civil package on the main line and the 5th overall package for Indore Metro’s Yellow Line. Currently, the technical bid evaluation is underway for Package IN-05R which covers an 8.626 km underground section of the Yellow Line. 

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.