Page 33 - Demo
P. 33
www.metrorailnews.in METRO RAIL NEWS -AUGUST - 2025 33Navi Mumbai: From Satellite Town to Smart CityOverview %u2022Navi Mumbai Metro is an urban Mass Rapid Transit System (MRTS) with 1 operational line and several proposed lines in Navi Mumbai. City and Industrial Development Corporation (CIDCO) is the agency in charge of the Navi Mumbai Metro project. The operational Line 1 of Navi Mumbai Metro spans 11.1 km between CBD Belapur %u2013 Pendhar through 11 stations. Intervention by Maha Metro%u2022In February 2021, CIDCO entered into an agreement with Maha Metro for completing the balance work of Navi Mumbai Metro Line 1. Maha Metro was responsible for the Operation and Maintenance of Navi Mumbai Metro Line-1 for 10 years, starting from its Commercial Operation Date on 17th November 2023.In June 2024, Konkan Railway Corporation Limited (KRCL) took over the operations and maintenance responsibilities of Navi Mumbai Line 1.Key SpecificationContractor%u2019s List Navi Mumbai Metro%u2019s Operational Route Overview Currently, Line 1 of the Navi Mumbai Metro Rail Project is operational. The operational Line 1 of Navi Mumbai Metro spans 11.1 km between CBD Belapur and Pendhar through 11 stations. Construction work on Navi Mumbai Metro%u2019s Line1 started in November 2011. The Commercial Operation of Navi Mumbai Metro Line-1 started on 17 November 2023 for the public of Navi Mumbai.Speed and Track Top Speed: 80 kmphAverage Speed: 34 kmphStandard Gauge: 1435 mmElectrification 25 kV, 50 Hz AC OHESignallingCab Signalling/Distance to GoRolling Stock24 coaches (8 train-sets x 3) supplied by CRRCEstimated Daily Ridership1 lakh/day (2027)ContractContractor / StatusGC: General Consultant of Navi Mumbai MetroLouis Berger %u2013 Balaji Railroad System JVRolling Stock contract for 24 coaches (8 trains of 3 cars)CRRC Zhuzhou Locomotive Co., LtdSignalling, Telecommunications, Automatic Fare Collection (AFC)Ansaldo STSCivil Package CA-1:Construction of 4.91 km viaduct from Khargar Sector 14 %u2013 PendharNCC Ltd.Civil Package CA-2:Construction of 4.34 km viaduct from Belapur to Khargar Sector 14J Kumar InfraprojectsCivil Package CA-12:Construction of 6 stations at CBD Belapur, Sector 7, CIDCO Science Park, Utsav Chowk, Sector 11 & Sector 14San Jos%u00e9 Constructora %u2013 Mahavir Roads %u2013 Supreme Infra JVCivil Package CA-13:Construction of 5 stations at Central Park, Pethpada, Sector 34 Kharghar, Panchanand & PendharSan Jos%u00e9 Constructora %u2013 Mahavir Roads %u2013 Supreme Infra JVNM-Geo: Geotechnical Investigation for Navi Mumbai Metro Line-2 and Line-3Zed Geotech Pvt. Ltd.PROJECT OF THE MONTH

