Page 60 - Demo
P. 60
60METRO RAIL NEWS -MAY - 2025 www.metrorailnews.in TENDER DETAILSLOCATIONVALUEDEADLINEappointment of general consultant for visakhapatnam metro rail project - phase 1 (three corridors - 46.23 kms)Visakhapatnam, Andhra Pradesh, India%u20b9 224.00 Cr.09-06-2025appointment of general consultant for vijayawada metro rail project -phase 1 (two corridors) - 38.40 kmsVijayawada, Andhra Pradesh, India%u20b9 205.00 Cr.16-06-2025including interior fit outs, design & construction of external facade, water supply, sanitary installation, drainage for 07 elevated stations viz. esic nagar, prem nagar, indira nagar, nanavati hospital, khira nagar, saraswat nagar & bandra of metro line 2b corridor [d.n. nagar to mandale] of mumbai metro rail project of mmrda.Mumbai, Maharashtra, India%u20b9 177.25 Cr.29-05-2025construction of affordable housing & commercial development above aquarium and model town stations of corridor-2 of surat metro rail project phase-iMulti Location%u20b9 123.36 Cr.18-06-2025facility management services (fms) for 18 stations, mihan depot and 11 trainsets of line-1 of nagpur metro rail project for providing the following: (a) mechanized housekeeping, cleaning service (b) ticketing (tom/efo) services (c) security services for the period of 03 (three) years.Nagpur, Maharashtra, India%u20b9 70.26 Cr.10-06-2025tender for facility management services (fms) for 19 stations, hingna depot and 12 trainsets of line-2 of nagpur metro rail project for providing the following: (a) mechanized housekeeping, cleaning service (b) ticketing (tom/efo) services (c) security services for the period of 03 (three) year.Nagpur, Maharashtra, India%u20b9 66.63 Cr.10-06-2025facility management services - lumpsum based - metro railway stations and associated locations; housekeeping, pest control service, housekeeping staff on shift basis as per atc; consumables to be provided by service provider (inclusive in contract co.. , facility management services - lumpsum based - metro stations as per scheule b to e as per atc documents; housekeeping, pest control service, schedule b to e as per atc documents; consumables to be provided by service provider (inclusive in contractMumbai, Maharashtra, India%u20b9 52.78 Cr.06-06-2025facility management services - lumpsum based - metro railway stations and associated locations; provision of ticket vending services and customer service staff at metro stations & associated locations package 3: grant road to cuffe parade metro stations of mml 3); consumables to be provided by service provider (inclusive in contract cost).Mumbai, Maharashtra, India%u20b9 37.29 Cr.30-05-2025appointment of authority engineer for providing project management services for \including birati ug station building & subways (with entry-exit structures) for two underground metro stations (birati & michael nagar) by cut & cover method (top down with diaphragm wall/ bottom up method with support arrangement) including architectural finishing, firefighting, water supply, sanitary installation, drainage & blt works, e&m service, ecs service, tvs services, power supply system with 750 vKolkata, West Bengal, India%u20b9 25.98 Cr.16-06-2025transportation of kolkata metro railway coaches from integral coach factory (icf), chennai / noapara (belgharia link line), kolkata to metro car depot at joka/kolkata including loading at integral coach factory, chennai / noapara (belgharia link line), kolkata and unloading at metro car depot at joka with all statutory and safety arrangementMulti Location%u20b9 13.45 Cr.05-06-2025LIVE TENDERS METRO RAIL

