Bangalore (Metro Rail News): Bangalore Metro Rail Corporation (BMRCL) has invited bids for 2 architectural finishing contracts for Bangalore Metro Phase 2B. 

Contract 1 

Tender Details 

Opening Date28 Mar 2025
Closing Date12 May 2025 
Estimated Cost of Work INR 77.12 Crores
Completion Period of Work 16 Months
Pre-Bid Meeting 19.04.2025 
Date of the opening of Tender (Technical Bid) 13.05.2025 at 4.30 PM
EMD₹ 77,12,000

Scope of Work 

Contract 1 includes the architectural finishing work for 5 elevated stations of Package 2 and one elevated station of Package 3 of Bangalore Metro Phase 2B. 

Stations 

  • Hebbal
  • Kodigehalli
  • Jakkur Cross
  •  Yelahanka
  • Bagalur Cross 
  •  Doddajala

BMRCL Brief Scope of Work: “Architectural Finishing and Public Health Engineering Works for 6 Elevated Stations viz, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka, Bagalur Cross of Package-2 and Doddajala of Package-3, in Phase 2B line of Bangalore Metro Rail Project”

About Packages 2& 3 

Package 2: In 2021, NCC Ltd. bagged the civil construction Package 2 of Bangalore Metro Phase 2B. The scope of work under this package includes the Construction of an 11.678 km viaduct and 5 stations from Hebal to Bagalur Cross. 

Package 3:  In 2021, NCC Ltd. bagged the civil construction Package 2 of Bangalore Metro Phase 2B. The scope of work under this package includes the Construction of 15.011 km of viaduct and 2 stations at Bettahalasuru and Doddajala. 

Contract 2 

Tender Details 

Opening Date28 Mar 2025
Closing Date12 May 2025
Estimated Cost of Work INR 99.96 Crores 
Completion Period of Work 16 Months 
Pre-Bid Meeting 19.04.2025 
Date of the opening of Tender (Technical Bid) 13.05.2025
EMD₹ 99,96,000

Scope of Work 

The contract 2 includes the architectural finishing work for 8 elevated stations of Package 1 of Bangalore Metro Phase 2B. 

Stations 

  • Kasturi Nagar
  •  Horamavu
  • HRBR Layout 
  • Kalyan Nagar
  •  HBR Layout
  •  Nagawara 
  • Veeranna palya 
  • Kempapura

BMRCL Brief Scope of Work:“ Architectural Finishing and Public Health Engineering Works for 8 Elevated Stations viz, Kasturi Nagar, Horamavu, HRBR Layout, Kalyan Nagar, HBR Layout, Nagawara, Veeranna palya, Kempapura of Package-1, in Phase 2B line of Bangalore Metro Rail Project”. 

About Bangalore Metro Phase 2B 

The Bangalore Metro Phase 2B is an under-construction “airport-link” section of the Blue Line, which spans 37 km from  Bengaluru city to Kempegowda International Airport (KIAL) in Devanahalli through 17 stations.

NO COMMENTS

LEAVE A REPLY Cancel reply

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version