Indore Metro

Operational Operator: Madhya Pradesh Metro Rail Corporation (MPMRCL) Length: 33.53 km Updated: Official site ↗

Indore Metro is an operational ring-shaped metro system built by Madhya Pradesh Metro Rail Corporation (MPMRCL), with an operational stretch of 17.5 km across 16 stations from Gandhi Nagar to Malviya Nagar Chowraha. Fares run ₹20 to ₹30, trains operate 9:00 AM to 7:00 PM roughly every 15 minutes. Its route map, stations, fares and timings are below.

Indore Metro, delivered by Madhya Pradesh Metro Rail Corporation (MPMRCL), is one of two metros the corporation is building in the state alongside Bhopal. Its Phase 1 comprises a roughly ring-shaped corridor of around 33 km, mostly elevated with an underground segment, serving Madhya Pradesh’s largest city and commercial capital.

The 6.3 km priority section, connecting the Gandhi Nagar (Super Corridor) area, was inaugurated in May 2025, beginning passenger operations. It was extended to 17.5 km across 16 stations on 6 September 2026, running from Gandhi Nagar to Malviya Nagar Chowraha, while the rest of the ring, including a new underground tunnel between the Airport and Bada Ganpati, remains under construction.

Why it matters

Indore’s near-circular alignment is unusual among Indian metros, most of which are radial or linear. Combined with Bhopal, it makes Madhya Pradesh a test of running two metro builds in parallel under one corporation, a model for how mid-sized states manage simultaneous transit programmes cost-effectively.

Key facts

  • Operator: Madhya Pradesh Metro Rail Corporation (MPMRCL)
  • Phase 1: ~33.5 km, 29 stations, ring corridor (elevated + underground)
  • First opened: 31 May 2025 (6.3 km priority section, Super Corridor area)
  • Operational now: 17.5 km, 16 stations, Gandhi Nagar to Malviya Nagar Chowraha (since 6 September 2026)

Explore more

Official source: www.mpmetrorail.com

Latest updates

7 tenders tracked →

See all news & updates →

Phases

PhaseLinesStationsLength (km)Status
Line 3 (Yellow ring)Super Corridor–Airport loop2933.53Operational (17.5 km / 16 stations since Sep 2026)

Latest ridership: About 200/day on the initial 6.3 km section (early 2026); updated figures pending for the 17.5 km extension opened 6 Sep 2026

Milestones

  • Super Priority Corridor inaugurated (6.3 km, Gandhi Nagar–Super Corridor-3)
  • First TBM 'Narmada' launched for the Airport–Bada Ganpati underground tunnel
  • Extended corridor (Gandhi Nagar–Malviya Nagar Chowraha, 17.5 km, 16 stations) opens to passengers

Fares

Indore Metro fares range from ₹20 to ₹30, set by Madhya Pradesh Metro Rail Corporation (MPMRCL).

Distance / zoneFare
1 to 2 stations₹20
3 to 5 stations₹30

Timings

Indore Metro service timings and frequency:

ServiceTime
First train9:00 AM
Last train7:00 PM
FrequencyEvery 15 minutes

Frequently asked questions

What is the status of Indore Metro?

As of September 2026, a 17.5 km stretch (Gandhi Nagar to Malviya Nagar Chowraha, 16 stations) of Indore Metro's ring Line 3 is operational, with the rest of the corridor, including a new underground tunnel, under construction.

How long is Indore Metro?

Indore Metro's Line 3 ring corridor is planned for about 33.53 km in total; 17.5 km is currently operational.

Who operates Indore Metro?

Indore Metro is implemented by Madhya Pradesh Metro Rail Corporation (MPMRCL).

What are the Indore Metro timings?

On the operational stretch, Indore Metro runs from 9:00 AM to 7:00 PM with trains every 15 minutes.

How much is the Indore Metro fare?

Indore Metro fares range from ₹20 to ₹30, set by Madhya Pradesh Metro Rail Corporation (MPMRCL). A smart card usually gives a small discount.

Journey Planner & Route Map

Awarded tenders & contracts

Tender / ContractAgencyValueAwarded to
AFC system (shared Bhopal + Indore contract) ₹150 Cr Aurionpro Solutions

Ongoing tenders

No ongoing tenders for this project right now.

Upcoming tenders

No upcoming tenders announced yet.

Bid values, closing dates and awardees are for subscribers. See plans.