The Mumbai- Ahmedabad High Speed Rail Project progressed as National High Speed Rail Corporation (NHSRCL) has successfully completed the launching of 130 m span of a 230 m (130 +100) long steel bridge over National Highway-64 and Bharuch Dahej freight line of Indian Railway tracks near Kanthariya village, Bharuch district, Gujarat.

This continuous steel bridge features two spans of 130 m and 100 m. On 9 December 2025, the 130 m span was launched. This span measures 18 m in height and 14.9 m in width, with a weight of approximately 2,780 metric tonnes. Fabricated at a workshop in Bhuj, Gujarat, the bridge is designed for a 100-year lifespan.
The bridge launching was completed in just 12 hours using intermittent blocks on freight tracks and road diversions on NH-64. These measures ensured safety and precise execution during the phased process. All activities were carefully planned to minimize disruptions for road users and ongoing freight operations.

Details of completed steel bridges
| Sr. No. | Location | Length of the steel bridge (in meters) | Weight of the steel bridge (in MT) |
| 1 | Across National Highway 53, Surat, Gujarat | 70 | 673 |
| 2 | Over Vadodara-Ahmedabad main line of Indian Railways, near Nadiad, Gujarat | 100 | 1486 |
| 3 | Over Delhi-Mumbai National Expressway, near Vadodara, Gujarat | 230 (130 + 100) | 4397 |
| 4 | Near Silvassa in Dadra & Nagar Haveli | 100 | 1464 |
| 5 | Over Western Railways, Vadodara, Gujarat | 60 | 645 |
| 6 | Over two DFCC Tracks and two Western Railways tracks, Surat, Gujarat | 100, 60 | 2040 |
| 7 | Over two DFCC tracks, near Vadodara, Gujarat | 70 | 674 |
| 8 | Over DFCC tracks near Bharuch, Gujarat | 100 | 1400 |
| 9 | Over NH-48, near Nadiad, Gujarat | 2 x 100 | 2884 |
| 10 | Over Railway Facility (Laundry) in Ahmedabad, Gujarat | 60 | 485 |
| 11 | Over Cadilla Flyover, Ahmedabad, Gujarat | 70 | 670 |
| 12 | Over NH-64 and Bharuch Dahej Freight line of IR, Bharuch, Gujarat | Span 1 : 130 m (completed) – 2780 MTSpan 2 : 100 m (in progress) | |
The Mumbai–Ahmedabad High-Speed Rail (MAHSR) corridor is a 508.17 km long under-construction high-speed rail line which connects Mumbai in Maharashtra with Ahmedabad in Gujarat through 12 stations.
Stations: Mumbai (Bandra Kurla Complex), Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand/Nadiad, Ahmedabad, and Sabarmati
A total of 28 steel bridges are planned along the Mumbai–Ahmedabad Bullet Train corridor. Out of 28 steel bridges, 11 are located in Maharashtra while the remaining 17 are located in Gujarat.
Explore how AI-integrated systems are improving comfort, connectivity, and accessibility for passengers across metro and rail networks at the 6th edition of InnoMetro, India’s leading expo for the Metro & Railway industry which is going to held on 21-22 May 2026 at Bharat Mandapam, New Delhi
Register now: https://innometro.com/visitor-registration/






